7.3 Managing a Schedule

Table of Contents Previous Next


7 Common Operations : 7.3 Managing a Schedule

Step 1 (For SMR only): Make sure the subscription server whose node is the parent of the subscription you wish to change is running and has been registered in the xDB Replication Console you are using. See Section 5.3.1 for directions on starting and registering a subscription server.
Step 1 (For MMR only): Make sure the publication server whose node is the parent of the controller database you wish to change is running and has been registered in the xDB Replication Console you are using. See Section 5.2.1 for directions on starting and registering a publication server.
Step 2 (For SMR only): Select the Subscription node of the subscription for which you wish to update the schedule.
Step 2 (For MMR only): Select the Publication Database node designated as the controller database for which you wish to update the schedule.
Step 3 (For SMR only): Open the Scheduled Task Wizard dialog box in any of the following ways:
Step 3 (For MMR only): Open the Scheduled Task Wizard dialog box in any of the following ways:
Step 4: The Configure Scheduler confirmation box appears. Click the Yes button.
Step 5: In the Scheduled Task Wizard dialog box, create the new schedule. See Step 3 of Section 7.2 for details on how to create a new schedule.
Step 1 (For SMR only): Make sure the subscription server whose node is the parent of the subscription you wish to change is running and has been registered in the xDB Replication Console you are using. See Section 5.3.1 for directions on starting and registering a subscription server.
Step 1 (For MMR only): Make sure the publication server whose node is the parent of the controller database you wish to change is running and has been registered in the xDB Replication Console you are using. See Section 5.2.1 for directions on starting and registering a publication server.
Step 2 (For SMR only): Select the Subscription node of the subscription for which you wish to remove the schedule.
Step 2 (For MMR only): Select the Publication Database node designated as the controller database for which you wish to remove the schedule.
Step 3 (For SMR only): Remove the schedule in any of the following ways:
Step 3 (For MMR only): Remove the schedule in any of the following ways:
Step 4: In the Removing Schedule confirmation box, click the Yes button.

7 Common Operations : 7.3 Managing a Schedule

Table of Contents Previous Next